▶ Technical Overview
Expect to generate profits (generate power and secure certified emission reductions, etc)
Classification |
Main content |
Investment |
Profits (operate for 360 days) |
1year |
5years |
10years |
Our technology |
Always operating at flow rates below 70% |
500m KRW / 100kW capacity |
155,520,000KRW |
777,600,000KRW |
1,555,200,000KRW |
300m KRW / 50kW capacity |
77,760,000KRW |
388,800,000KRW |
777,600,000KRW |
Existing technology |
Stop operating at flow rates below 70% |
500m KRW/ 100kW capacity |
85,000,000KRW |
425,000,000KRW |
850,000,000KRWw |
Solar power generation |
Lack of operation time (3.6 time/ 1day ) |
200m KRW / 100kW capacity |
45,000,000KRW |
225,000,000KRW |
455,000,000KRW |
■ Level of existing technology : Operational rate and efficiency are insufficient as a large capacity
water dam generation system
■ Our operating performance (small hydro power generator)
- 2013 : completed 50kW in Posco factory line
- Installed 1 set (invested 300m KRW) Investment verified by the BS project, considering extended application
- 2013 : self-use after power production by using the water treatment, water return line in posco factory
- Manufacture, installation (2 sets, 80KW) using effluence from the flatfish farm in Wando county
▶ Comparison by Generator Type